Water/Wastewater
  • Register

COPPER COVE WATER TREATMENT PLANT TANK C IMPROVEMENTS

COPPER COVE WATER TREATMENT PLANT TANK C IMPROVEMENTS

Calaveras County Water District

Copperopolis, CA

  • Construction Management Services Provided During Full Operation of Existing Plant
  • Project Elements Include: Two new rectangular 60’ x 320’ reinforced-concrete flocculation and sedimentation basins with shared center wall for pre-treatment of source water
  • Additional Elements Include: Chemical feed lines; Axial mixers; Solids collection equipment; Pump station; Large-diameter steel pipelines and mechanical/electrical instrumentation/controls