Water/Wastewater
  • Register

CCWD ON-CALL CONSTRUCTION MANAGEMENT SERVICES

On-Call Construction Managment Services

Calaveras County Water District

San Andreas, CA

  • Construction management, inspection and additional services provided on an as-needed basis
  • Projects have included: State Route 4 / Angels Camp Bypass Sewer Relocation Project – the relocation of 2,000 lineal feet of four-inch sewer pipe, fittings and appurtenances.
  • Caltrans-reimbursement project
  • Included two highway crossings with steel casings constructed using horizontal drilling methods and in accordance with the State's encroachment permit
  • Pipeline was relocated to accommodate Caltrans’ new Highway 4/Angels Camp Bypass project.
  • Copperopolis Water Storage Tank & Transmission Main Project – a highly visible project that serves the water needs for the newly developed Copperopolis Town Square.

 

NEWLAND / YOCKEY STORM DRAIN, WATER AND SEWER IMPROVEMENT

COPPER COVE WATER TREATMENT PLANT TANK C IMPROVEMENTSGarden Grove, CA

  • $3.3M - Full Service Construction Management including Resident Engineer and Inspection for the City of Garden Grove
  • 300LF New reinforced concrete box and transition structures
  • Project Elements Include: 1,343 Feet New,102 inch reinforced concrete pipe through major intersection; 3 sewer line installations and water line relocations; Junction structures, Catch basins and Laterals

CESAR CHAVEZ ELEMENTARY SCHOOL SANITARY SEWER INSTALLATION

COPPER COVE WATER TREATMENT PLANT TANK C IMPROVEMENTS

Corona, CA

  • $1.4M - Full Service Construction Management for Corona-Norco Unified School District
  • Installation of New Sewer System for Year Round School
  • 3,600LF of 15, 12 and 8 Inch Ductile Iron Pipe
  • 21 Concrete Precast Manholes and three 21 Inch Steel-Casing Jack-and-Bore Locations
  • Installed Additional Sewer Laterals, Retaining Walls and Footings on Adjacent Residential Properties

GOLDEN STATE WATER COMPANY

COPPER COVE WATER TREATMENT PLANT TANK C IMPROVEMENTS

Golden State Water Company

Los Angeles County, CA

  • On-Call Inspection Services for Public Utility Company
  • Project Elements Include: Installation and replacement of water mains, storm drains, water service, fire hydrants, fire service, air valves, and similar construction in Region III’s Foothill District and Mountain/Desert District

COUNTY LINE CHANNEL

COUNTY LINE CHANNEL

Riverside County Flood and Water Conservation District

Riverside, CA

  • $12.9M - Construction Management Services including Resident Engineer and Inspection for the Riverside County Flood Control and Water Conservation District
  • 3 mile drainage channel that discharges into the Cucamonga Creek Channel with underground developments passing under 2 city streets
  • 25 Acres of Impact Area
  • Project Elements Include: 13,600LF total length - 7,300LF reinforced concrete box, transitions to another 6,300LF open rectangular channel
  • Funded by Riverside County Flood Control and Water Conservation District, San Bernardino County Flood Control District, Santa Ana Watershed Project Authority and the City of Ontario