Utilities
  • Register

NEW MODEL COLONY

New Model Colony

Ontario, California

  • $67M - Full Construction Management Services, Constructability Review, Inspection, Contract Administration and Stormwater Compliance
  • New Model Colony consists of four specific projects: Archibald and Edison Street Improvements, Francis Water loop, Edison Bridge and the Landscaping inprovements
  • Construction includes infrastructure improvements including domestic and recycled water systems, sewers, storm drain systems, utility coordination, roadway improvements, a new bridge and landscaping
 
 

SORRENTO

Sorrento

Lincoln, California

  • $25M - Full Construction Management and Inspection Services
  • Sorrento is a 472-Unit Planned Development on 156 Acres
  • Located adjacent to Lincoln Crossings and the future Village 7 developments, Sorrento is comprised of 350 Single Family detached homes, 116 multi-family homes and a 5 acre regional park
  • Construction includes mass grading, installation of underground utilities, concrete, paving for residential construction, the completion of Sorrento Parkway, installation of 5,000 lf of sewer trunkline and road reconstruction
 

RIVER ISLANDS PHASE I INFRASTRUCTURE AND VILLAGE DEVELOPMENT

River Islands

Lathrop, California

  • $100M - 4,800 Acre Master Planned Community that will provide over 11,000 residential units, several schools, a Town Center, Regional High Tech Employment Center, and over a dozen lakes.
  • Phase I of the project, "Entry Road", includes the construction of backbone infrastructure to serve the River Islands Technology School (opened Fall 2013) and future development of Phase 1A and B. Project elements include two miles of arterial roadway extension and associated utility installations, including six jack and bore utility extensions under the UP railroad, connection to a regional 30" domestic water transmission main and large scale site dewatering to install underground utilities.
  • Phase 1A of the project included the construction of 498 residential lots, the first of three sewer lift stations with SCADA control and flushing system, over 2 miles of sewer force main, regional park with boat house and community plaza areas for gathering
  • Phase 1B provides an additional 1,000 residential units, a 100 acre Town Center, high and medium density housing, a 150 Acre Regional High Tech Employment Center, seven lakes and completion of the Bradshaw's Crossing bridge connection to Mossdale Landing

CALIFORNIA STATE WATER PROJECT

CALIFORNIA STATE WATER PROJECT Department of Water Resources

Statewide, CA

  • Awarded second Statewide, 5-Year On-Call Contract
  • Support Construction Activities including Construction Management, Project Management, Construction Inspection and Contract Administration
  • Elements Include: Levees, Water Conveyance Structures, Pump Stations, Dams, Reservoirs, Building Facilities and Water/Wastewater
  • Coordination with Environmental Mitigation, Restoration and Enhancement Facilities, Recreation Facilities, Flood Protection Facilities Including the Federal/State Sacramento River Flood Control Project