Utilities
  • Register

NEWLAND / YOCKEY STORM DRAIN, WATER AND SEWER IMPROVEMENT

COPPER COVE WATER TREATMENT PLANT TANK C IMPROVEMENTSGarden Grove, CA

  • $3.3M - Full Service Construction Management including Resident Engineer and Inspection for the City of Garden Grove
  • 300LF New reinforced concrete box and transition structures
  • Project Elements Include: 1,343 Feet New,102 inch reinforced concrete pipe through major intersection; 3 sewer line installations and water line relocations; Junction structures, Catch basins and Laterals

 

 

CESAR CHAVEZ ELEMENTARY SCHOOL SANITARY SEWER INSTALLATION

COPPER COVE WATER TREATMENT PLANT TANK C IMPROVEMENTS

Corona, CA

  • $1.4M - Full Service Construction Management for Corona-Norco Unified School District
  • Installation of New Sewer System for Year Round School
  • 3,600LF of 15, 12 and 8 Inch Ductile Iron Pipe
  • 21 Concrete Precast Manholes and three 21 Inch Steel-Casing Jack-and-Bore Locations
  • Installed Additional Sewer Laterals, Retaining Walls and Footings on Adjacent Residential Properties

NATOMAS AND SOUTH RIVER PUMP STATIONS

COPPER COVE WATER TREATMENT PLANT TANK C IMPROVEMENTS

Natomas and South River Pump Stations / Sacramento Regional County Sanitation District

West Sacramento, CA

  • Lower Northwest Interceptor Program
  • 235 mgd via 200,000 gallon storage and 120” diameter pipeline
  • Project Elements Include: Twin 1,750 hp, Standby Generators; Instrumentation and Control; and Startup and Testing

CCWD / CITY OF BRENTWOOD WATER TREATMENT PLANT

CCWD / CITY OF BRENTWOOD WATER TREATMENT PLANT

Contra Costa Water District

Oakley, CA

  • New 15-Million-Gallon-Per-Day Water Treatment Plant
  • Full Construction Management Services including Resident Engineer, Inspection (civil, electrical, mechanical), Scheduling, Startup/Testing Coordination, Administrative Support and Material Testing
  • Project Elements Include: Flocculation and Sedimentation Basins; Ozone Contractors; Activated Carbon Filters; an Operations Building; Chemical Building and Chemical Storage Area
  • Additional Elements Include: 1.5-Million-Gallon Concrete Clearwell with Integral Chlorine Contact Chamber; a Raw Water Pump Station; Washwater Lagoons; Pipelines; Electrical Infrastructure; Instrumentation; Roads and Associated Sitework and Improvements

CITY OF FRESNO WATER METER IMPLEMENTATION PROGRAM

CITY OF FRESNO

City of Fresno

  • $65M – Construction Management and Inspection Services
  • Turn-Key Type Program
  • 4-Year Contract to perform retrofit and/or installation of over 111,000 water meters
  • Web-Based Information System