Rail
  • Register

LATHROP ROAD / UPRR WESTERLY GRADE SEPARATION PROJECT

Lathrop Grade Sep

Lathrop Road / UPRR Westerly Grade Separation Project

  • $13.5M Construction Value
  • Work includes a new concrete box girder bridge over UPRR tracks, 130,000 CY of import borrow, new signalized intersections and improvements to drainage, sewer and water
  • Multiple funding sources, SJCOG Measure K, CTC, UPRR Safety Program
  • Services include Resident Engineering, Project Inspection, Quality Assurance, Materials Testing and Document Control
  • Close coordination with environmental and design engineering consultants, UPRR and California Public Utilities Commission (PUC)