CALTRAIN BRIDGE PROGRAM, PENINSULA CORRIDOR JOINT POWERS BOARD

Caltrain Bridge Program

San Carlos

  • $126M - As a subconsultant to URS Corporation, VC&A provided Construction Management and Support Services for several Amtrak Bridge Projects and Passenger Rail Service Between San Francisco and Gilroy
  • Caltrain Bridge Replacement Projects Include: Jerrold Bridge, Poplar Avenue, Santa Inez Avenue, Monte Diablo Avenue, Quint Street and Tilton Avenue Bridges
  • San Francisco Roadway Bridges Include: 22nd Street, 23rd Street and Paul Avenue
  • South San Francisco Station Parking Lot Re-Grading, Re-Paving and Installation of Drainage and Lighting Improvements

 

FIFTH STREET OVERCROSSING AT INTERSTATE 215

FIFTH STREET OVERCROSSING AT INTERSTATE 215

San Bernadino Associated Governments (SANBAG)

San Bernadino

  • $23M – Full Construction Management Services including Resident Engineer, Structures Representative, and Field/Office Engineer
  • New Bridge Construction and Removal of Existing Bridge in Stages
  • Spanned Four Sets of Burlington Northern Santa Fe Railroad Tracks
  • Tranny Award Winner for Bridge/Grade Separation Project of the Year

JOINER PARKWAY / HWY 65 OVERHEAD (PHASE I & II)

Joiner Parkway

Lincoln

  • Joiner Parkway/Hwy 65 Overhead (Phase I & II), Lincoln
  • $10M – Full Construction Management Services including Resident Engineer, Office Engineers, Inspection, Surveys and Materials Testing
  • 2 Bridges and Adjoining Roadway, Large Diameter Piles and UPRR
  • Significant Coordination with Caltrans, UPRR, Regional Water Quality, and Department of Fish and Game
  • Public Relations as well as UPRR Coordination led to a Project success

JEFFERSON AVENUE UNDERPASS

Jefferson Avenue

Redwood City

  • $9.2M - Full Construction Management Services including Resident Engineer, Assistant Resident Engineer, Inspection, Railroad Coordination, and Materials Testing
  • New railroad grade separation between Jefferson Avenue and Caltrain Commuter Tracks
  • Project Elements Include: Replacement of an At-Grade railroad signal crossing; Two-Span, pre-stressed/post-tensioned, decorative, arched railroad bridge
  • Coordination with Union Pacific Railroad, Peninsula Corridor Caltrain, Amtrak and Joint Powers Board
  • Winner of APWA Project of the Year Award for Excellence

WINEVILLE AVENUE GRADE SEPARATION

Wineville

Ontario

  • $2.8M - Full Construction Management including Resident Engineer, Structures Representative, Inspection and Railroad Coordination
  • Project Elements Include: New, cast-in-place, pre-stressed, box girder railroad underpass, beneath a new city street
  • 3,000 Foot Railroad Shoofly of the Mainline Track
  • 30 Foot high temporary tie back shoring system 10 feet off centerline of track
  • Major utility installation and coordination